Around 5 years of experience in a packaging film process plant.
Issues ranging from electrical to software, instrumentation, telecommunication, chiller, air compressors, slitting machines etc. troubleshooted in minimum possible time.
Maintaining report of events.
Experience in team management and working in groups during shutdowns.
Having meetings with manager(s) as how to maintain and improve the overall efficiency of the plant by planning maintenance shutdowns.
Worked as a trainee and then shift Engineer of Electrical and Instrumentation department at Astro Films BOPP plant at Gadani Industrial Area. Troubleshooting and fixing any complain related to electrical/instrumentation during the shift. Got promoted to Maintenance Engineer in 2019.
Worked as a Sales Engineer for Husaini Electric Works. Arranged meetings with different companies.
Worked as an intern at the switch gear factory of R.A Engineering and Services that makes electrical panels for industries.
Worked as an intern at the AMHS system and in the control tower at the Jinnah International Airport, Karachi.